Continuous test data management for microservices, Part 2: Key steps

This is part 2 in a series on applying test data management (TDM) to microservices. Part 1 can be found here


The continuous TDM process for microservices applications is similar to that for general continuous TDM, but tailored to the nuances of the architecture. The key differences are as follows: 

Step 1(b): Agile Design

Rigorous change impact analysis during this step is key to reducing the testing (and the TDM) burden for microservices applications—especially in the upper layers of the test pyramid and the CD stages of the lifecycle. There are various ways to do this, following are a few highlights: 

(a)   Code-change-based impact analysis (also known as a white-box, inside-out approach). Through this approach, we identify which services and transactions are affected by specific code changes in implementing backlog requirements. We then focus testing and TDM efforts on those services and transactions affected. This approach is supported by tools such as Broadcom TestAdvisor and Microsoft Test Impact Analysis. This approach is more useful for white and gray box testing, specifically unit and component testing.  

(b)  Model flow-based impact analysis (also known as a black-box, outside-in approach). Here we do change impact analysis using flows in model-based testing. This analysis helps to highlight key end-to-end or system integration scenarios that need to be tested, and can also be traced down to individual components and source code. This approach is supported by such tools as Broadcom Agile Requirements Designer, and is more beneficial for testing in the upper layers of the test pyramid. 

I recommend a combination of both approaches to ensure sufficient test coverage, while minimizing the number of tests in a microservices context. Based on the change impact set, we prepare test data for the tests discussed in the previous section. 

Step 2(a): Agile Parallel Development 

As discussed in the previous section, as part of development, a component developer must also define and implement these APIs:

  •  APIs that allow us to set test data values in the component data store. These are sometimes referred to as mutator APIs. 
  • APIs that allow us to extract test data values, for example, from instances of components in production. These are also known as accessor APIs.

Developers should use the white-box change impact testing technique discussed above to focus their unit and component testing efforts. 

Step 2(b): Agile Parallel Testing

This is an important stage in which testers and test data engineers design, or potentially generate or refresh, the test data for test scenarios that have been impacted by changes and that will be run in subsequent stages of the CI/CD lifecycle. This assessment is based on the backlog items under development. Testers use the TDM approaches described above for cross-service system testing and end-to-end testing.  

In addition, the test data will need to be packaged, for example, in containers or using virtual data copies. This approach can ease and speed provisioning into the appropriate test environment, along with test scripts and other artifacts.  

Step 3: Build

In this step, we typically run automated build verification tests and component regression tests using the test data generated in the previous step. 

Step 4: Testing in the CD Lifecycle Stages 

The focus in these stages is to run tests in the upper layers of the test pyramid using test data created during step 2(b).  The key in these stages is to minimize the elapsed time TDM activities require. This is an important consideration: The time required to create, provision, or deploy test data must not exceed the time it takes to deploy the application in each stage.  

How do you get started with continuous TDM for microservices?

Continuous TDM is meant to be practiced in conjunction with continuous testing. Various resources offer insights into evolving to continuous testing. If you are already practicing continuous testing with microservices, and want to move to continuous TDM, proceed as follows:   

  • For new functionality, follow the TDM approach I have described. 
  • For existing software, you may choose to focus continuous TDM efforts on the most problematic or change-prone application components, since those are the ones you need to test most often. It would help to model the tests related to those components, since you can derive the benefits of combining TDM with model-based testing. While focusing on TDM for these components, aggressively virtualize dependencies on other legacy components, which can lighten your overall TDM burden. In addition, developers must provide APIs to update and access the test data for their components. 
  • For other components that do not change as often, you need to test less often. As described above, virtualize these components while testing others that need testing. In this way, teams can address TDM needs as part of technical debt remediation for these components. 

The post Continuous test data management for microservices, Part 2: Key steps appeared first on SD Times.



from SD Times https://ift.tt/BK8qxns

Comments

Popular posts from this blog

Difference between Web Designer and Web Developer Neeraj Mishra The Crazy Programmer

Have you ever wondered about the distinctions between web developers’ and web designers’ duties and obligations? You’re not alone! Many people have trouble distinguishing between these two. Although they collaborate to publish new websites on the internet, web developers and web designers play very different roles. To put these job possibilities into perspective, consider the construction of a house. To create a vision for the house, including the visual components, the space planning and layout, the materials, and the overall appearance and sense of the space, you need an architect. That said, to translate an idea into a building, you need construction professionals to take those architectural drawings and put them into practice. Image Source In a similar vein, web development and design work together to create websites. Let’s examine the major responsibilities and distinctions between web developers and web designers. Let’s get going, shall we? What Does a Web Designer Do?

A guide to data integration tools

CData Software is a leader in data access and connectivity solutions. It specializes in the development of data drivers and data access technologies for real-time access to online or on-premise applications, databases and web APIs. The company is focused on bringing data connectivity capabilities natively into tools organizations already use. It also features ETL/ELT solutions, enterprise connectors, and data visualization. Matillion ’s data transformation software empowers customers to extract data from a wide number of sources, load it into their chosen cloud data warehouse (CDW) and transform that data from its siloed source state, into analytics-ready insights – prepared for advanced analytics, machine learning, and artificial intelligence use cases. Only Matillion is purpose-built for Snowflake, Amazon Redshift, Google BigQuery, and Microsoft Azure, enabling businesses to achieve new levels of simplicity, speed, scale, and savings. Trusted by companies of all sizes to meet

2022: The year of hybrid work

Remote work was once considered a luxury to many, but in 2020, it became a necessity for a large portion of the workforce, as the scary and unknown COVID-19 virus sickened and even took the lives of so many people around the world.  Some workers were able to thrive in a remote setting, while others felt isolated and struggled to keep up a balance between their work and home lives. Last year saw the availability of life-saving vaccines, so companies were able to start having the conversation about what to do next. Should they keep everyone remote? Should they go back to working in the office full time? Or should they do something in between? Enter hybrid work, which offers a mix of the two. A Fall 2021 study conducted by Google revealed that over 75% of survey respondents expect hybrid work to become a standard practice within their organization within the next three years.  Thus, two years after the world abruptly shifted to widespread adoption of remote work, we are declaring 20